summaryrefslogtreecommitdiff
path: root/src/rebar_core.erl
Commit message (Collapse)AuthorAgeFilesLines
...
* | comment typoBob Ippolito2010-05-081-1/+1
| |
* | add variables for create-app and create-node to helpBob Ippolito2010-05-081-2/+2
|/
* New commands and opts (-V/--version/version/help)Tuncer Ayaz2010-05-031-15/+34
|
* Merging w/ mainlineDave Smith2010-04-171-25/+30
|\
| * Document xref commandTuncer Ayaz2010-04-151-25/+30
| | | | | | | | | | Also add a sleep after printing so that the io server has written all output before exiting. It's a work around.
* | Add simple warning if no modules are interested in handling a command for a ↵Dave Smith2010-04-171-0/+3
|/ | | | given directory
* Add check-deps to shell completion and commands infoTuncer Ayaz2010-03-261-0/+1
|
* Add get-deps and delete-deps to commands info and shell completionTuncer Ayaz2010-03-171-1/+4
| | | | | Add get-deps and delete-deps to commands info string and bash completion script.
* Merging w/ mainlineDave Smith2010-03-161-29/+74
|\
| * Add option to show available commandsTuncer Ayaz2010-03-081-29/+74
| | | | | | | | | | Implement new option -c/--commands to print available commands and its variables.
* | Revamp deps system to NOT pull down deps automatically. You must now use ↵Dave Smith2010-03-161-39/+46
|/ | | | pull-deps explicitly
* Fix bug in templater where escript was not found in subdirs were specified ↵Dave Smith2010-02-201-0/+5
| | | | in rebar.config; minor formatting cleanups
* Provide package support for eunit; build_plt now includes listed ↵theiw2010-02-051-1/+1
| | | | applications; begin including -spec annotations
* Do not print dynamic escript name in usage infoTuncer Ayaz2010-02-021-1/+1
|
* Simplified usage info printing with getopt v0.2Tuncer Ayaz2010-01-091-12/+10
|
* Implemented option to specify number of concurrent workers a command may useTuncer Ayaz2010-01-061-5/+28
|
* Another round of refactoring to yield better flexiblity in the base_compiler ↵Dave Smith2010-01-031-2/+2
| | | | system
* Break out command line argument parsing to a dedicated routineDave Smith2010-01-011-27/+36
|
* Merging w/ bitbucketDave Smith2009-12-311-6/+10
|\
| * Rolled back getopt to restore custom variablesTuncer Ayaz2010-01-011-6/+35
| |
| * Added vi modeline/emacs local variables to file headersTuncer Ayaz2009-12-311-0/+2
| |
| * Enhanced option parsing with new getopt and made rebar more user friendlyTuncer Ayaz2009-12-311-40/+13
| |
* | Make sure to reset CWD after processing subdirs; also filter out missing ↵Dave Smith2009-12-311-1/+8
|/ | | | dirs when restoring code path
* Deleted trailing whitespaceTuncer Ayaz2009-12-301-6/+6
|
* Implemented getopt option supportTuncer Ayaz2009-12-291-4/+50
|
* Refactoring core logic in preparation for dependency mgmt; breaking out ↵Dave Smith2009-12-251-23/+31
| | | | sub_dir determination into dedicated module
* Minor formatting fixDave Smith2009-12-201-1/+2
|
* Make sure to fail if run_modules generates ANY error. Thanks, Rusty. :)Dave Smith2009-12-141-2/+2
|
* Fixing number of warnings and bugletsDave Smith2009-12-141-7/+2
|
* Merging mainlineDave Smith2009-12-121-1/+14
|\
| * Make sure crypto is running as lots of things use itDave Smith2009-12-091-0/+3
| |
| * Remove unnecessary debug in _core; adding EQC flag for eunit buildsDave Smith2009-12-081-1/+0
| |
| * Updating bootstrap to embed the build time into a macro that we can pull via ↵Dave Smith2009-12-071-1/+12
| | | | | | | | "version" command
* | Refactor of core logic to provide better control over recursion and code ↵Dave Smith2009-12-121-108/+99
|/ | | | path mgmt
* Refactor rebar to build a self-contained scriptDave Smith2009-12-041-1/+1
|
* If failure is controlled (i.e. via ?FAIL macro), don't print out that it ↵Dave Smith2009-12-031-0/+2
| | | | failed (expectation is that the caller already did that)
* Adding first crack at reltool supportDave Smith2009-12-021-40/+38
|
* Adding support for subdirsDave Smith2009-12-011-2/+23
|
* Fix some minor typos; create simple install/bootstrapping scriptDave Smith2009-11-291-1/+3
|
* More gross structural work; now has log levels and broken out log level controlDave Smith2009-11-291-0/+208